CAD Operators
  HOME
  |  
  |  
  |  
  |  
  |  
  |  
  |  
CADOperators.com, LLC
USVI Civil Drawing Samples

All drawings meet or exceed the strict U.S. Virgin Island local codes.

Click images for 1:1 representation.
Note, images are from various projects and may not correspond with other images.

Site Plan and Land Section - 1"=20' scaled (depending on site size) that show property lines, setbacks, contours as applicable. Includes earth change notes, vicinity map and site legend. All information must be provided by you, we can assist in where to get this information. We charge by the hour for these drawings. On average, it takes 2-3 hours depending on information you need for the building department.
Site Details - larger scales of septic tank, distribution system and perforated pipe cover.  This may also include environmental control measures such as silt fence details. Cisterns are included if part of the building requirements. On average, it takes 1-2 hours depending on calculating and sizing your systems.
Waterfront Site Plan and Land Section - 1"=20' scaled (depending on site size) that show property lines, setbacks, contours as applicable. Includes earth change notes, vicinity map and site legend. All information must be provided by you, we can assist in where to get this information. We charge by the hour for these drawings. On average, it takes 2-3 hours depending on information you need for the building department.
Waterfront Site Details - larger scales of septic tank, distribution system and perforated pipe cover. This includes environmental control measures such as silt fence details. Cisterns are included if part of the building requirements. On average, it takes 1-2 hours depending on calculating and sizing your systems.
For Public & Home Owners For Builders & Developers For Architects For Engineers Competitor Funnies Non Paying Customers
Site created and maintained by CADOperators.com, LLC - Copyright © 1997-2002, 2003-2010, All Rights reserved.